Preconstruction / Contracting Services

Pre-construction planning produces the most beneficial results when it starts as soon as the project. In this way, budgets are more accurately determined at project inception, most if not all of the design intent is maintained, materials and long lead items are ordered or prepurchased to ensure availability, the project schedule is maintained and costs can be significantly reduced.

The preconstruction phase of every project without a doubt is one of the critical phases of the project. Most projects run in trouble on the plan table before the construction effort even begins. One of the key ways to avoid that is to involve the project the management team from the offset at the conceptual stage of the project.

As the design of the project moves from concept to the bid Final Design and Construction Phase, the cost to make changes to the project go up, being highest if any changes are made during the construction phase.